Building Regulation Applications in Reigate, Surrey & London
- Stage 4 / Technical Design -
Building Regulation Application
A detailed set of drawings will be produced including everything required in order to gain approval from your Local council / Approved inspector. Plans, Sections, Elevations, Details will be produced to include the construction build-ups of each element. Building regulation notes will be added to the drawings.
We will work closely with the appointed structural engineer in order to update the drawings with a coordinated structural design.
Below and above ground drainage will be indicated on the drawings where we believe it is viable.
Electrical layouts to indicate approximate positions of power and lighting, and most importantly - Smoke / Carbon monoxide detectors.
We consider sound proofing where required, particularly between properties via separating walls and floors. This will be picked up on the large scale sections and 1:2/1:5 details.
This bui;ding regulation / detailed set of construction drawings/information can either be submitted to the council as a Full Plans Application before construction commences, or utilized by the builder who will serve the council a Building Notice. The plans will be checked and approved by Building Control.
By this point, the pack of design information compiled will generally be sufficient for a builder to price the shell and core of the proposal, however schedule of works may be required on more complex projects.
Once the scope / design is agreed with the client in the form of a tender pack, the information can then be submitted to a number of builders.
Example Detailed Building Regulation Drawings -
Foundation Plan -

General Arrangement Plan -

GA Section -

Steel Fabrication Drawings -